THE RUBBER DUCK™

FACT: 👉🏼 no public declaration or Congressional approval needed as long as… | The X Archive | The Rubber Duck™

· This post in the monthly archive · Open this post in the X Archive · View this post on X

FACT: 👉🏼 no public declaration or Congressional approval needed as long as POTUS notifies Congress within 48 hours AND ends the deployment within 60 days (plus a 30-day withdrawal window).

this will be the model - and israeI will be dealt with last.

Original post by The Rubber Duck (@TheRubberDuck79). Text is shown as posted. This page is a crawlable permalink into the X Archive.